top of page
Substructure 1
Substructure 3
Substructure 4
20210407_120500
Substructure 5
LEMENAGEDRONE-121220-72-4
20210407_115622
IMG_6153
IMG_6182
IMG_6155
IMG_6174
IMG_6177
20210906_161018
20210906_163028
20220124_161805
20220124_161759
20220124_161615
20220124_161629
20220321_161146
20220321_161151

Le Menage

​

​

La Route des Blanches Development

CBL Consulting were appointed as the as the Structural and Civil Engineer on behalf of Ravenscroft Construction to help them with the delivery of 26 new two-bedroom dwellings – 10 apartments for the Guernsey Housing Association, 12 chalet bungalows for those aged over 55, and four apartments available for wider ownership.

​

CBL Consulting were responsible for undertaking and providing preliminary, construction and as built site wide drainage design, drawings & details for both foul and surface water services to all 26 units. As well as this we assisted Ravenscroft on site-wide road & kerb levels and setting out, the design and setting out of service trenches, and provided substructure design for each unit in accordance with the requirements for their timber frame superstructure. CBL Consulting also carried out fortnightly site visits and inspections throughout the entire duration of the works.

SITE CLIENT: VIEUX MOULIN LTD.

​

CBL CLIENT: RAVENSCROFT CONSTRUCTION

​

ARCHITECT: LOVELL OZANNE PARTNERSHIP

​

CONTRACTOR: RAVENSCROFT CONSTRUCTION

bottom of page