top of page
Demolition
194146488_2206047152864577_7288772466218414437_n
192524716_2206047149531244_82407712010485787_n
214011281_2239267106209248_7234258167895829192_n
213722002_2239267112875914_1882306767831608884_n
213286803_2239267102875915_8420030899324338440_n
232253484_2262441423891816_2463821417994868317_n
244610379_2313124135490211_1130728312468376786_n
255858107_2342490635886894_6839742854510838482_n
255354386_2342490632553561_2263739654391036687_n
272152674_2399161230219834_2394414793475555931_n
272245841_2399161233553167_3215361641223154090_n
272256967_2399161226886501_861866757488898818_n
273012357_2408297942639496_713940978459582735_n
277781303_2456758431126780_4006068900835139182_n
288155722_2518838584918764_1190043089169797611_n
273012357_2408297922639498_2836495058871225333_n
273125026_2408297935972830_1298837358345254928_n
288091557_2518838588252097_1794570609665636296_n
272954978_2408297939306163_603831396392878187_n
277765626_2456758437793446_2531665020231328430_n
277788417_2456758434460113_503393834216555385_n
284405721_2502914639844492_7592026169281991927_n
283143544_2502914636511159_5791280355411316893_n
283381866_2502914646511158_3505413472988002556_n
297595193_2561653687303920_1922393121409410568_n
297481555_2561653680637254_8170240282304245887_n
313440590_571382228323501_5823222202818883260_n
313871238_571382231656834_2099694340463029669_n

The Lea
 


Currently Under Construction 

The Lea is a brand-new development located in the parish of the Forest. These stylish & high specification properties will be low maintenance & thermally efficient.

​

Works to develop 'The Lea' began with the complete demolition of the previous 'Blossom Fields' care home. CBL Consulting have acted as both Structural & Civil Engineer throughout this project to provide complete civil & structural design & detail. CBL were responsible for providing complete design & detail for both foul & surface water drainage services, optimising the use of the sites proposed permeable paving & soakaway systems to disperse surface water. Foul water from the units was designed to travel throughout site into a singular high-capacity on-site cesspit. Substructure for each of the units was designed and detailed by CBL Consulting in the form of reinforced concrete raft slabs, while superstructure was designed to optimise the use of traditional construction materials; timber, steel, concrete, and masonry.

CLIENT: INFINITY GROUP

​

ARCHITECT: DLM ARCHITECTS

​

CONTRACTOR: INFINITY CONSTRUCTION

bottom of page